OdinTask field-service app OdinTask ODINTASK · GUIDE
quoting

Handling the Too Expensive Objection: What to Actually Say

11 July 2026 · 9 min · quotingpricingsalescustomer communicationtrades business

Handling the too expensive objection starts with a question, not a discount. When a customer says your quote is too expensive, they mean one of two very different things: either the number is genuinely more than they have, or they cannot see what they are paying for. Those need opposite responses. So ask one thing before you say anything else: "Is that more than you want to spend, or more than you expected?" If it is more than they expected, show them the labour cost against the material cost and let the split do the explaining. If it is more than they have, take work out of the scope until the price fits, and never take money off the same scope. And if all they want is for you to match someone else's number, say no politely and move on to the next job.

"Too expensive" almost never means "too expensive"

Two customers say the same four words for completely different reasons.

Guessing wrong costs you either way. Explain your value to someone standing at a budget wall and you sound defensive and a bit desperate. Knock money off for someone with a value gap and you have just told them the first number was invented — and that the next one is negotiable too.

The one question that separates them

Ask it on the phone, not by email. Email lets them think about the number in isolation; a call lets you hear the pause.

Then shut up. The silence after that question does more work than any script.

Show the labour against the material

Most customers price your job in their head using the only number they can look up: the parts. They saw the board on a wholesaler site for £180 and your quote says £1,251. The gap looks like profit. It is not, and one table fixes that faster than five minutes of talking.

Here is a real-shaped example — a domestic consumer unit replacement:

LineDetailEx VAT
Labour1 electrician, 9 hours£522
Testing and certificationCircuit testing, EIC, notification£116
Materials18-way board, RCBOs, glands, sundries£340
Travel2 visits, parking£45
WasteOld board removal and disposal£20
Total ex VAT£1,043
VAT at 20%£208.60
Customer pays£1,251.60

Now the conversation is different. Roughly 61% of that job is a qualified person's time and a certificate with their name on it. About 35% is parts. The customer thought they were buying a fuse board. They are buying nine hours, a test schedule, a notification to building control, and someone who carries the liability if it goes wrong at two in the morning.

Two rules for the breakdown:

Cut the scope, not the price

This is the whole discipline, and it is the part almost everyone gets wrong.

If you take 10% off the same scope, you have not made the job cheaper. You have made your day cheaper. The work is identical, the hours are identical, the risk is identical — you just gave away most of a day's profit to avoid an awkward pause on the phone.

Instead, hand back a smaller job:

Then send two options, not a new price. Option A is the original. Option B is the reduced scope with the removed items visibly listed as removed. Seeing what disappeared is what makes Option A look reasonable — and a surprising number of people buy A after you offer B.

Three answers that lose you money

Scripts you can actually say out loud

Sweden: ROT changes the number the customer is looking at

If you work in Sweden, the price objection has a built-in answer that many firms bury at the bottom of the quote. The ROT deduction takes 30% off the labour cost — not the materials — and the customer gets that as a reduction on your invoice, not as a refund they chase later.

Take a 25,000 SEK job including VAT: 15,000 labour and 10,000 materials. ROT takes 30% of the labour, so 4,500 SEK comes off and the customer pays 20,500. You then claim the 4,500 back from Skatteverket. There is an annual ceiling per person, shared with RUT, and it moves — check the current amount at skatteverket.se rather than quoting a figure from memory.

Two consequences worth understanding. First, the labour-versus-material split stops being an explanation and becomes money: on a labour-heavy job the deduction is worth far more than any discount you were about to offer. Second, showing the gross total first and the ROT net price second is throwing away your best answer — the net figure should be the big number on the page.

Outside Sweden the mechanism differs but the principle holds: check whether any reduced VAT rate or scheme applies to the work before you discount, because a scheme is free to you and a discount is not. In the UK, reduced or zero VAT rates apply to certain energy-saving installations and some residential conversion work — verify the current rules with HMRC for your specific job rather than assuming.

This is the sort of thing worth automating. In OdinTask, quotes calculate the ROT deduction on the labour lines automatically and show the customer the net price, so the deduction is doing its job in the first ten seconds instead of the last.

When to say no instead of matching

You need a floor, and you need to know it before the phone rings. Work out your break-even day: add everything you pay in a year whether you work or not — van, insurance, tools, accountant, software, phone, your own wage — and divide by realistic billable days. Not 260. Take off holiday (25 days is the statutory minimum in Sweden; 28 including bank holidays in the UK), public holidays, sick days, and the days you lose to quoting, chasing and paperwork. Most owner-operators land somewhere near 190 to 210. That number is your floor. Below it you are paying for the privilege of working.

Say no when:

Say it cleanly and without sulking: "I don't think I'm the right fit on price for this one. If the other quote falls through, call me and I'll still be here." Some of them call back. The ones who do not were never going to be profitable.

Kill the objection before it ever arrives

Most price objections are a quoting problem wearing a sales costume. Fix the quote and the conversation mostly stops happening:

None of that is sales technique. It is just refusing to send a single unexplained number and hoping. If your quotes go out fast, break out the labour, show the deduction net, and offer a real second option, you will hear "too expensive" a lot less — and when you do hear it, you will already know which of the two things it means. Start a free trial of OdinTask and build the quote that answers the objection before the customer makes it.

FAQ

What do you say when a customer says your quote is too expensive?

Ask one question before anything else: is it more than you want to spend, or more than you expected? "More than expected" is a value gap — answer it with a breakdown showing labour and hours against materials. "More than I've got" is a budget wall — answer it by removing work from the scope until the price fits. Do not discount the same scope, and do not apologise for the number.

Should I lower my price to win the job?

No. Cutting 10% off an unchanged scope does not make the job cheaper, it makes your day cheaper — same hours, same risk, less profit. If the customer needs a smaller number, give them a smaller job: phase the work, let them do the strip-out and making good, change the specification, or remove the optional extras. The price should always follow the scope, never the other way round.

How do I handle a customer who has a cheaper quote from someone else?

Ask to see it, and compare scopes rather than totals. Cheaper quotes are usually a smaller job: fewer hours, no certification, no making good, cheaper parts, or exclusions buried at the bottom. Walk through the differences factually without any comment on the other firm. If they genuinely are doing identical work for less, say so and let the customer take it. Honesty there wins the next job.

When should I walk away from a price negotiation?

Walk when the discount would take the job below your break-even day rate, when they want your full scope at someone else's price and will not discuss the difference, when they are negotiating hard before you have started, or when they want cash with no certificate or paperwork. Say it plainly and leave the door open. Customers who only buy on price rarely become profitable ones.

How does the Swedish ROT deduction affect the price objection?

ROT takes 30% off the labour cost, not the materials, and it comes off your invoice directly rather than being refunded later. On a labour-heavy job that is usually worth far more than any discount you were considering. Show the ROT net price as the headline figure instead of the gross total. There is an annual per-person ceiling shared with RUT, and it changes — check the current amount at skatteverket.se.

Should I show a full cost breakdown on my quotes?

Show labour, hours, materials, travel, waste and certification. Do not show your markup or margin as a line, because that invites a line-by-line negotiation you cannot win. Putting hours next to your hourly rate is the strongest move: most customers will argue with a total, but very few will tell a qualified tradesperson that their time is worth less than they charge.

One system for your field-service business

Booking, quotes with ROT, scheduling, an offline app, time tracking and invoicing — in your own brand.

Try OdinTask free