What a Work Order Should Contain: The 12-Field Spec

26 June 2026 · 9 min · work ordersadminfield serviceinvoicingcompliance

A work order should contain twelve things: an order number, the customer and the invoice recipient (often not the same party), the site address down to the unit or floor, access details (key, door code, key safe, entry phone, lift, parking), a named on-site contact with a mobile number, the scope written as what is included and what is explicitly not, the materials split into van stock and what is on order, the expected time on site, the billing basis with the labour split, any tax-relief flag such as Sweden's ROT deduction, the certificate or protocol the job must produce, and before and after photos. Anything thinner is not a work order. It is a reminder, and whoever invoices on Friday pays for the gap.

That list is the minimum input the rest of your business needs. Three machines read the order afterwards: invoicing, the compliance certificate, and payroll. Each reads a different field, and a blank field makes that machine stop or guess. A guess in invoicing is a credit note. A guess in payroll is a grievance. A guess on a certificate is the one an inspector eventually asks about. A thin order used to be survivable because a human rebuilt it on the phone. That hour is now automated away, and automation has no memory.

The 12 fields a work order should contain, and what breaks without each

FieldWhat it must sayWhat breaks without it
1. Order numberOne reference from enquiry to paidPhotos, hours and materials attach to nothing. You invoice from memory.
2. Customer and invoice recipientLegal entity, company number, invoice address or e-invoice IDThe invoice goes to the tenant, not the landlord. Thirty days lost, then it restarts.
3. Site addressStreet, unit, floor, building, gateThe van is at the wrong door. The first hour is unbillable.
4. AccessKey, door code, key safe, entry phone, must someone be home, parkingAn abort. The most expensive blank box on the sheet.
5. On-site contactName and mobile of whoever is actually thereEvery small decision escalates into a call to the office.
6. ScopeA verb list, plus explicit exclusionsExtra-work disputes you cannot win.
7. MaterialsOn van / ordered / customer-supplied, with supplier and delivery dateA second trip, and a supplier invoice nobody can match to a job.
8. Expected timeHours and an arrival window, not "morning"The planner lies, and so does every job after it that day.
9. Billing basisFixed price or time and materials, rate, callout, labour vs material splitThe labour split cannot be rebuilt, so the tax-relief claim fails.
10. Tax-relief flagROT, green tech or reduced-rate VAT, plus the data it needsYou invoice the gross price, then credit it and reissue.
11. Required protocolWhich self-inspection or certificate this job owesYou cannot hand over. It surfaces weeks later, or at an inspection.
12. PhotosA named shot list, before and afterNo defence in a dispute. Your word against theirs.

The rest of this covers the fields people get wrong. Nobody forgets the address. Everybody forgets the gate code.

Access: the field that decides whether the day happens

Access is not "customer will be home". It answers one question: how does a technician who has never been here get through the door, and what happens if nobody answers?

An aborted visit costs the travel, the slot and the goodwill, and is almost never billable. If you add one field after reading this, make it a mandatory access box that cannot be left empty at booking.

Scope: write verbs, not nouns

"Kitchen" is not a scope. "Bathroom refurb" is not a scope. A scope is a list of things a person does, and a list of things that person does not do.

Included: replace consumer unit with 12-way board, test and certify, make good around the board. Not included: rewiring behind plaster, replacing meter tails (network operator's job), redecorating, removal of the old cooker.

The exclusions are the whole point. Every dispute about extra work is a dispute about a sentence nobody wrote. In Sweden that argument is called ÄTA; in the UK and New Zealand it is a variation, and consumer-contract rules tend to make an unwritten scope the contractor's problem. Put the exclusions on the order and on the quote, and week three lasts thirty seconds.

Materials: three buckets, never one

The second bucket is where money leaks. Without the supplier reference on the order, the supplier invoice lands four weeks later and nobody can say which job it belongs to. That is unbilled material. Photographing it onto the job card the moment it arrives is the cheapest fix there is.

Expected time: an honest number beats a hopeful one

Expected time tells the planner how many jobs fit in a day and gives you a variance to learn from. Never record the estimate and you never find out that your standard board change takes 5.5 hours, not the 4 you keep quoting. Give an arrival window, not a time. Keep estimate and actual as separate numbers so they can disagree in public. That disagreement is your pricing data.

The tax-relief flag: decide before the invoice, not after

In Sweden this is the ROT deduction. On qualifying repair and maintenance at a private home, the customer's share of the labour cost drops by 30% and you claim the rest from Skatteverket. There is an annual ceiling per person, shared with RUT; the amount changes, so check the current figure at skatteverket.se. Green-tech work such as solar, storage and EV charge points runs on its own separate scheme.

Set the flag before you invoice, because it changes what you must collect: the identity number of each claimant, the property designation or housing-association details, and the split between co-owners. Chasing that afterwards means a credit note and a reissue. Outside Sweden the field still earns its place. In the UK it flags the reduced or zero VAT rate on qualifying work, decided on the order rather than at the invoice run. Elsewhere it is a landlord versus owner-occupier split, or an insurance claim with its own paperwork. Same field, same discipline: set once, at the top of the chain.

Required protocol: name the certificate the job owes

Compliance fails for a boring reason. Nobody told the technician a certificate was due, so nobody tested while the board was still open. The order should name the document. In Sweden that is the egenkontroll for the job type, part of the installer's own quality system under Elsäkerhetsverket's rules rather than an optional extra. In the UK it is the Electrical Installation Certificate or Minor Works Certificate under BS 7671, Part P notification where it applies, or a Gas Safe record. In New Zealand it is the Certificate of Compliance, plus an Electrical Safety Certificate for prescribed work under the Electricity (Safety) Regulations 2010.

The pattern is identical everywhere: the protocol is a field on the order, not a memory. A digital form the technician must complete before the job can close is the only version that survives a wet Friday afternoon.

Photos: name the shots, do not just say "take photos"

The "during" shots are the ones that pay. A photo of a cable run before it is plastered over is the difference between a short conversation and a claim. Photos must attach to the order number, not a camera roll, or they do not exist when you need them.

What breaks downstream, chain by chain

None of the three fails loudly. That is what makes a thin order dangerous: the van goes out, the work gets done, and the failure lands in the accounts three weeks later.

Who fills in what, and when

  1. At booking (office): customer, invoice recipient, address, access, on-site contact, expected time, billing basis, tax-relief flag. No technician should invent this in a stairwell.
  2. Before the van moves (technician): confirm materials on board, confirm access, confirm the arrival window.
  3. On site (technician): hours on the clock, materials used, extra work logged the moment it is agreed, photos, protocol signed off.
  4. At close (system): nothing to type. The invoice, the certificate PDF and the payroll line are read off the order.

Step four is the test. If anyone retypes something after the job closes, the order was too thin. A system built around the job card — OdinTask is ours — makes fields mandatory at booking, carries the ROT flag from quote through to invoice, and closes the job only when the protocol and photos are there. Paper can do the same. It is just harder to enforce.

Fill the twelve fields in before the van moves and the rest of the week does what it is told. If you would rather have that as a system than a checklist, start a free trial and put one job through end to end. More in the same vein on the blog.

FAQ

What should a work order contain as a minimum?

The bare minimum is an order number, the customer and the invoice recipient, the full site address, access details such as a key or door code, a named on-site contact with a mobile number, a scope that says what is included and what is not, and the expected hours. Without those seven, the technician phones the office and the invoice gets rebuilt from memory.

What is the difference between a work order and a job sheet?

A work order is the instruction issued before the work: who, where, what, how long, on what basis. A job sheet is what comes back afterwards, carrying hours, materials used, extra work and signatures. In most modern systems they are the same record at two points in its life, which is the point: one number, one thread, from booking to paid.

Should extra work go on the original work order or a new one?

Log it on the original order, at the moment it is agreed, in writing, with a price or an hourly basis. Only open a second order if it is genuinely a separate visit. Extra work agreed verbally and written up later is a common cause of unpaid invoices in trades, because the customer remembers the conversation differently to you.

Why does a work order need a ROT or tax-relief flag?

Because the flag changes what you must collect before invoicing. Sweden's ROT deduction cuts the customer's share of the labour cost by 30% at a private home, with an annual per-person ceiling shared with RUT; check the current amount at skatteverket.se. It needs identity numbers and property details up front. Set the flag at booking, or you will be crediting an invoice.

How many photos should a work order require?

Name the shots rather than a number. Before: existing installation, pre-existing damage, meter reading. During: anything about to be covered up, such as cable runs before plastering. After: finished work, labels, serial numbers, tidy site. Six to ten purposeful photos attached to the order number beat forty in a camera roll nobody can find later.

Is a digital work order actually better than paper?

Paper works if the fields are complete and the sheet comes back. The advantage of a digital order is enforcement: fields can be mandatory, photos attach to the order number automatically, the clock records real hours, and the invoice and certificate are read off the same record. If anyone retypes something after the job closes, the order was too thin.